About Project
Location: Beaumont, Texas
Description: Lloyd Engineering, Inc. provided FEL-3 and final design services for P66 associated with a proposed new ship dock along the Sabine Neches River. Ship dock 4 was designed to accommodate up to Suezmax vessels and support product transfer via three marine loading arms. The ship dock design was a completely modular dock, fabricated entirely offsite, and included all piping and process equipment installed prior to delivery to the site.
Project Details
- Categories:Construction Mgmt, Design, Earth Retention, Permitting
- Skills:Engineering