Multi Buoy Mooring

Multi Buoy Mooring

About Project

Location: Acajutla, El Salvador

Description:  Working with Buzca Ltd., LEI provided engineering review and consulting services for the design and installation of a multi buoy mooring system for vessels up to 77,000dwt and a new 14” subsea pipeline. The previous MBM system required optimization due to its operational restrictions and the new orientation was designed to improve operational availability.  LEI also provided construction management services during the installation of the buoy anchor system and subsea pipeline.

Project Details
  • Categories:Construction Mgmt, Design, Offshore
  • Skills:Engineering