Location: Haven, KS
Description: LEI performed engineering services at the Haven plant site. This facility is a 1.3 BCFD dual-train cryogenic NGL extraction plant, designed for both Ethane recovery and Ethane Rejection. LEI provided all site civil and structural design for the plant. This included pipe supports and foundations for over 27,000 ft of piping, over 50 miscellaneous pad & deep foundations, site grading & drainage, access, permit assistance, and coordination with all disciplines. This was critical due to the fact that the length of time from inception to commission was only 24 months.
Project Details
- Categories:Design, Site Work
- Skills:Engineering