LNG Re-Gasification Terminal

LNG Re-Gasification Terminal

 

 

About Project

Location: Freeport, Texas
Description:
A). Lloyd Engineering, Inc. (LEI) provided owner’s engineer services to manage the design and construction of all onshore and marine/dredging civil/structural components for a 1.55 BCF throughput LNG re-gasification terminal. LEI managed the installation of all pilings, dolphins, mooring systems, dock, unloading arms, gangway and dredging

B). LEI will continue to provide Owners engineering services for the planned conversion to a Liquefaction facility for all onshore civil/structural components. LEI will provide detailed design and construction management for widening the Berth basin, Shoreline Stabilization and a second LNG dock facility. LEI will also provide CM for the widening of the Freeport Ship Channel entrance to the Gulf of Mexico. This project will allow large vessels to safely pass each other in the ship channel entrance.

Project Details
  • Categories:Construction Mgmt, Design, LNG, Ship Dock
  • Skills:Engineering