About Project
Location:
Description: LEI has assisted the client, with various projects at the Fabrication Facility and Heavy Load Out Dock in Corpus Christi Texas. Projects include:
- Design of the rehabilitation of the bulkhead. This allows the client to have larger vessels dock at the facility and improves loading and unloading of topsides.
- Design of new mooring and breasting systems at the Dock. The new systems provide the client with a Dock that can handle larger ships.
- Design of dredging and dredge disposal facilities for the deepening of the berth
- Consultation on spacer barges to allow vessels to dock at the facility for repair and fabrication of topsides.
Project Details
- Categories:Barge Dock, Construction Mgmt, Design, Dredging, Earth Retention, Rehab/Repair
- Skills:Engineering